Designing & Building the Future of Florida
Lower your costs. Reduce your timeline. Discover the MBI difference.
The World of Commercial Real Estate Has Changed
We should know; we helped build it. Metrolina Builders has the experience to get the job done and you don't have to take our word for it.
IN BUSINESS
CLIENTS
IN SOUTHEAST
Late Apex.
Early Designs
Late Apex Storage Condos in Mooresville, NC offers luxury warehouse-style storage condominiums with flexible options for businesses, individuals, collectors, and investors. The Class A storage units range from approximately 450 s.f. to nearly 3,600 s.f. and come equipped with heavy-duty concrete drives, courtyards, restrooms, and mailrooms. Designed with ample space for RV’s to maneuver, Late Apex can accommodate the storage needs of all customers and provides a true luxury experience.
Sq Feet
100K
Build Cost
$14MM
Client Savings
20%
Unlock the Power of Design-Build
Looking to build a new facility in Central Florida? Don't start without our expert guide. Learn the critical steps to success and lower your costs by 20% or more. Download our Guide to Building Self-Storage today.
Check Out a Few of Our Projects in the Southeast
AT METROLINA BUILDERS, WE DESIRE TO CREATE A LEGACY OF TRUST AND CRAFTSMANSHIP AS WE SERVE OUR CLIENTELE.
Here's what they're saying:
#MEDICAL
This was our first project with Metrolina, and we could not have been any more pleased. We construct Doctors Care Urgent Care locations throughout the state of South Carolina, and this project and the job that Metrolina did ranks at the top of the list.
#INDUSTRIAL
We struggled for at least three years trying to find a suitable building site. From the beginning, Metrolina stuck by us as we analyzed five different locations in the area until we finally settled on our current site. The design and quality of the building met or exceeded all our expectations.
#MULTI-FAMILY
Upon our first meetings with Metrolina, we were impressed with their professionalism and commitment to meeting our high levels of expectations. This impression was carried out and confirmed upon completion of the project. The overall management of the construction process was a welcome change from previous contractor experiences.
#AUTOMOTIVE #INDUSTRIAL
Although the tall concrete retaining walls, high-level interior finishes, intricate structural steel framing system, and compressed schedule presented a substantial challenge, both in terms of time and quality control, I can truthfully say this is a project in which we can all take a great deal of pride. I would also like to recognize the outstanding efforts of your staff, some of whom have been involved in the design and construction of the other 150,000 square feet of buildings on our site.
# MEDICAL
In this day and age it is hard to find a company dedicated to the level of quality that you are. You consistently are looking out for my interests, both now and in the future, to reduce cost and improve productivity. I can't thank you enough for being there when we needed you to answer questions and make sure we stayed on target and within budget.